Friday, 10 January 2014

Planning for filming day 2

On Saturday 11th January 2014 I have planned to film my main actor Jack. Due to Jack being my main actor in my music video and the time restrictions we have to film on the day I will only be able to film him in one location and possibly not all shots of that location. I have devised together a plan of which shots I would like to get done. These shots are all at the Hessle foreshore/Humber Bridge location. These include a range of shots from shot number 3 to 91.



Once again I looked up the weather for the day of filming to make sure we was going to have dry weather enabling us to go forward with filming. As the weather was only going to be 7 celsius at its highest I wanted to be able to inform jack of the cold weather and let him know to be warm and comfortable but still keeping in the genre of the music video. I will also let him know that I will buy him a hot drink and food after filming. 


Making sure Jack knows what is expected of the day





I made sure Jack was up to date with what was going on and what is expected of him on the day allowing him to know when and where I need him to be with everything. Making sure Jack is informed will allow filming to flow easily with less complications.

No comments:

Post a Comment