Wednesday 26 March 2014

Music Video Second Draft

   

After receiving a lot of feedback from peers and teachers I was able to go away and improve my video with adding more footage and extra editing that it needed to be fully complete and improve the video overall.

When uploading my last draft the music was not up to standard and you could hear the background noises from when I filmed due to not fully muting the clips. This time I used a You Tube tutorial to allow me to fully understand how to mute the clips properly when it comes to uploading the video.
Teacher Feedback from First Draft of Music Video




After handing in my first draft I got some feedback from my teacher. This was comments such as more performance elements are needed in the video as well as working on editing more to the beat, which I will work on to improve my music video in the upcoming drafts.

Tuesday 25 March 2014

Filming Day 4 planned for last month was finally re-filmed on 22.3.14




On Saturday the 22nd of March I got the chance to shoot with Jack at Hessle Foreshore for the final shots of my music video. 

Above are the shot numbers and timings that I originally posted. I worked with jack for an hour and twenty minutes as the weather was rainy and windy, this disrupted my original shots of wanting Jack to be in forest. However I was able to film in a tunnel with him to get us out of the rain, which I feel benefited my video as the messy look of the walls and miserable weather added to the effects and fits to the genre of my music video.



This is the picture used throughout the music video, which I used with Jack and Mell throughout filming and on this shoot.